St Mary's Keystone Project
|
St Mary’s Church Keystone Project is designed to develop and improve the present church building to make it suitable for the needs and expectations of a 21st century population. We have a duty to preserve it for future generations not as a historic monument but as a living, functioning gathering place. Our vision therefore is for St Mary’s to be:
The Project is designed in phases which will be subject to redesign and reconfiguration as the work progresses. Phase 1 – the installation of new heating with gas boilers. Completed. Phase 2 – refurbishment of the Kingsmill Room (including repainting, replacement of chairs, new flooring and storage). Underway. Phase 3 – new electrical system, including lighting. Planning underway Phase 4 - installation of additional toilets; new flower room; and light catering facilities, all at the west end of the church. Phase 5 – Replacement of floor and pews in nave; redecoration of nave, possible re-siting of font, improved lighting and heating delivery. Phase 6– Possible reopening of North Door (with addition of porch etc) The Keystone Project is led by a Project Team chaired by Maggy Wallace and Deborah Power. Special fund-raising events are held on a regular basis. If you would like to contribute to the Project in any way please ring 01635 298794 or speak to Rev Lucy. Keystone Project Prayer Eternal God, whose church is made up of living stones built on the cornerstone which is Christ, we thank you that you have entrusted us with a beautiful and ancient building, a sign of your continuing presence in this community. Make us good stewards we pray. Guide us and inspire us with vision as we fulfill our responsibilities to maintain and enhance it as a place of witness and worship; that it may speak to generations yet unborn of your glory, your faithfulness and the worship of your saints on earth. Through our Lord and Saviour, Jesus Christ. Amen |